Ten guides for better decisions

Use the worksheets to define your priorities and compare a documented system. Each guide links primary references and explains the limits of the planning advice.

What size standby generator does your home need?

Start with the equipment you want powered, its starting demand and what can run together.

Read the guide

Standby vs. portable generators: choose for the outage you can manage

Choose standby when automatic backup and permanent household integration fit your needs and property.

Read the guide

Natural gas vs. propane: plan the fuel supply before the generator

Natural gas may fit a property with an adequate utility supply; propane may fit a property with suitable tank capacity and delivery access.

Read the guide

Where can a standby generator go? A placement checklist

A standby generator needs a location that satisfies its model-specific installation instructions and applicable local requirements.

Read the guide

Transfer switch options: essential circuits or a managed whole panel?

An automatic transfer switch changes the household supply between utility power and generator power within a properly designed system.

Read the guide

Build a standby-generator maintenance plan from your actual manual

A standby-generator maintenance plan should use the exact model’s manual, elapsed time, accumulated run hours and operating conditions.

Read the guide

Generator not starting? Collect useful facts without opening equipment

If a standby generator fails during an outage, first keep clear of unsafe conditions and protect your household’s immediate needs.

Read the guide

Prepare your standby generator for an Indiana winter outage

Prepare before cold weather by checking the model’s maintenance status, applicable cold-weather requirements, fuel-supply plan and safe access.

Read the guide

Compare generator quotes without missing the expensive differences

Compare generator quotes only after the equipment, fuel rating, backed-up loads and installation scope are aligned.

Read the guide

What to receive when a generator installation is finished

A completed generator installation should leave you with the approved equipment and circuit plan, required inspection records, a documented operating demonstration, model manuals and clear service responsibilities.

Read the guide

Equipment-specific backup planning